Cost of Data Centre Construction in Malaysia

The growing demand for cloud computing, big data analytics, and internet services in Malaysia has driven a significant rise in the need for data centres. These facilities are critical for businesses, governments, and industries looking to store, manage, and process large volumes of data. However, constructing a data centre is a complex and expensive process that requires careful planning, significant investment, and consideration of various factors. In this article, we explore the cost of data centre construction in Malaysia, the key factors influencing the overall cost, and provide answers to common questions regarding data centre development.


Factors Influencing the Cost of Data Centre Construction in Malaysia

The cost of constructing a data centre in Malaysia can vary significantly depending on various factors. Some of the key elements influencing the price include the type of data centre, its size, location, infrastructure, and the technology used. Here is an in-depth look at the primary factors that impact the cost of building a data centre in Malaysia.

1. Type of Data Centre

Data centres are typically categorized into several types, each with its own set of requirements and associated costs. The most common types include:

  • Enterprise Data Centres: These are built and maintained by large businesses for internal use. They are usually smaller in scale compared to commercial data centres and focus on specific business operations, which can reduce costs.
  • Colocation Data Centres: In colocation data centres, businesses rent space and share resources with others. These centres are usually more expensive to build due to the shared infrastructure and high security features.
  • Hyperscale Data Centres: These are large, industrial-scale facilities built for massive amounts of data processing. Due to their enormous size and complexity, hyperscale data centres are the most expensive to construct.

Each type of data centre has different construction requirements and costs associated with its size and scale. Hyperscale data centres, for example, require significant infrastructure, including heavy-duty cooling systems, high-capacity power supply units, and advanced security features, all of which add to the total construction cost.

2. Location

The location of a data centre plays a crucial role in determining construction costs. In Malaysia, areas with higher infrastructure availability and proximity to major cities like Kuala Lumpur or Penang tend to have higher land costs. On the other hand, building a data centre in rural areas with lower land prices could reduce construction expenses.

However, data centre locations are also chosen based on accessibility to power grids, internet connectivity, and climate conditions. Sites with a consistent and reliable power supply, favorable weather conditions for cooling, and strong internet infrastructure may come with additional costs but are essential for the efficiency and longevity of the facility.

3. Infrastructure and Technology

The infrastructure of a data centre is crucial to ensuring its functionality and reliability. This includes:

  • Power Supply and Backup: A consistent power supply is critical, as any downtime can affect operations. Data centres typically require a stable and redundant power supply, including backup generators and uninterruptible power supplies (UPS).
  • Cooling Systems: Cooling is another critical aspect of data centre design. These facilities house powerful servers that generate significant amounts of heat, so specialized cooling systems such as air conditioning, chillers, and liquid cooling may be necessary.
  • Security and Monitoring: A data centre must have high levels of security, including surveillance cameras, biometric access controls, fire suppression systems, and intrusion detection systems. These systems not only increase the safety of the facility but also add to the overall construction cost.
  • Networking Infrastructure: To ensure optimal performance and speed, data centres need advanced networking infrastructure, such as fiber optic cables, routers, and firewalls. The choice of technology will impact both the cost and the performance of the data centre.

These components add significant costs to the overall construction process. For instance, a robust cooling system and uninterrupted power supply (UPS) can account for a large portion of the total expenses.

4. Size and Capacity

The size of the data centre and its required capacity directly influence construction costs. Larger data centres with higher storage and processing capacities will require more materials, space, and labor. The design of the facility will also be customized to meet specific operational requirements, such as the number of server racks, power units, and cooling systems.

The higher the capacity, the greater the investment required to ensure the data centre is scalable, resilient, and capable of handling growing workloads.

5. Regulatory Compliance and Standards

Malaysia has specific regulations and standards governing data centre construction, including safety, environmental impact, and fire safety. Adhering to these standards may require additional investments in compliance measures, which can affect the overall construction cost.

For example, building codes related to earthquake resistance, fire suppression systems, and energy efficiency standards are critical when designing a data centre. Compliance with international standards like ISO 27001 (information security management systems) and Uptime Institute’s Tier standards can also add to the cost of construction but ensure the data centre operates effectively in the long term.


Estimated Cost of Data Centre Construction in Malaysia

Given the numerous factors involved, the cost of building a data centre in Malaysia can vary significantly. As a rough estimate, the cost for a small to medium-sized data centre (colocation or enterprise) might range from RM 5 million to RM 20 million (approximately USD 1 million to USD 4 million). For larger, more complex hyperscale data centres, construction costs can exceed RM 100 million (around USD 20 million), particularly when factoring in high-end infrastructure, security, cooling systems, and backup power supplies.

Costs can also be influenced by factors like the availability of skilled labor, material prices, and local taxes, which can vary from one region to another within Malaysia.


FAQs on the Cost of Data Centre Construction in Malaysia

1. What is the average cost to build a data centre in Malaysia?

The cost to build a data centre in Malaysia depends on several factors, including the size, type, location, and infrastructure. On average, smaller data centres may cost between RM 5 million and RM 20 million, while larger hyperscale centres can exceed RM 100 million.

2. How does the location affect the cost of data centre construction in Malaysia?

Location plays a crucial role in determining construction costs. Areas with higher land prices and infrastructure availability, such as Kuala Lumpur, will generally incur higher costs, while rural areas might offer more affordable land prices but may lack essential infrastructure.

3. What are the most expensive components of data centre construction?

The most expensive components of data centre construction include power supply systems, cooling systems, and security infrastructure. These systems are necessary to ensure the reliability, efficiency, and safety of the data centre, and their cost can add up significantly.

4. Can I reduce the cost of building a data centre by choosing cheaper materials?

While it is possible to reduce construction costs by choosing less expensive materials, it is not advisable to compromise on quality. Lower-quality materials may lead to higher operational costs or reduce the lifespan of the data centre. It is essential to strike a balance between cost and durability.

5. How long does it take to build a data centre in Malaysia?

The construction of a data centre typically takes between 12 to 24 months, depending on the complexity, size, and regulatory requirements. The process involves several stages, including site selection, design, construction, and testing, each of which takes time to complete.